Bengaluru: After a DH report on water scarcity in dhobi ghats, BWSSB engineers inspected the Vyalikaval and Rajajinagar ghats on Saturday and offered treated...
Tag: BWSSB
In the initial phase, the semi-automatic system will be installed at five chlorination plants and integrated with the Supervisory Control And Data Acquisition (SCADA)...
The newly built STP is planned with shared infrastructure, such as headworks, a sludge-handling system, and power generation with a 300 MLD capacity. WD...
Drinking water supply will remain shut for two days in parts of Bengaluru as the pumping station, which lifts water from the Cauvery river...