The ongoing project, approved in September 2020, has so far laid 1,451 km of water supply pipes, 1,110 km of sewer pipes, and connected...
Tag: Asian Development Bank
Kerala Water Authority (KWA) is expected to invite tender for the project soon. WD News: Considering the growing demand for potable water in Kochi...
WD News: The ongoing integrated storm water drain project in the Kosasthalaiyar and Kovalam river basins is noisy, with the levels ranging between 67...