News

IDE Technologies Secures Contract with CleanEdge Water to Design and Build New Wastewater Treatment Plant in India

The WWTP project will be supplied to CleanEdge Water’s client in Rajasthan, India, in 2024.

The WWTP project will be supplied to CleanEdge Water’s client in Rajasthan, India, in 2024.

WD News: IDE Technologies has announced that CleanEdge Water Pte Ltd. awarded IDE a contract to deliver a wastewater treatment plant (WWTP) for a mining industry application in India.

CleanEdge Water is a Singapore-based integrated industrial wastewater solutions provider for C&I clients in South East Asia and India on a BOOT basis.

The WWTP will be designed to treat 4.0 million litres of challenging brine per day, to reach the optimal recovery rate and availability. IDE’s MAXH2O Desalter was chosen for extracting quality product water from the mine’s drainage (reuse) in Rajasthan, India while producing minimum final brine.

The MAXH2O Desalter is designed to treat varying wastewater qualities as it is, without any required modification. The excess precipitants removal is conducted by releasing sustainable reusable dry Pellets ~90% D.S., without the need for a dewatering stage. This contrasts with other methods that require additional stages (e.g., IX regeneration waste and other sludge streams).

MAXH2O Desalter also produces brine with an exceptionally low scaling potential. This minimises the downtime of crystalliser and eventually leads to a simplified ZLD scheme and/or operational scheme.

Source: IDE Technologies
Image courtesy: Pixabay
https://tinyurl.com/yc8c5ad6

Leave a Comment

Your email address will not be published.

You may also like

Read More